fleet.wikisort.org - Ship

Search / Calendar

JS Inazuma (DD-105) is the fifth ship of Murasame-class destroyers. She was commissioned on 15 March 2000.[1]

JS Inazuma on 25 June 2004
History
Japan
Name
  • Inazuma
  • (いなづま)
Ordered1995
BuilderMitsubishi, Nagasaki
Laid down8 May 1997
Launched9 September 1998
Commissioned15 March 2000
HomeportKure
Identification
  • MMSI number: 431999646
  • Pennant number:DD-105
StatusActive
General characteristics
Class and typeMurasame-class destroyer
Displacement
  • 4,550 tons standard,
  • 6,200 tons hull load
Length151 m (495 ft 5 in)
Beam17.4 m (57 ft 1 in)
Draft5.2 m (17 ft 1 in)
Propulsion
Speed30 knots (56 km/h; 35 mph)
Complement165
Sensors and
processing systems
  • OYQ-9 CDS (w/ Link-11)
  • OYQ-103 ASWCS
  • FCS-2-31 fire-control systems
  • OPS-24B air search radar
  • OPS-28 surface search radar
  • OQS-5 hull sonar
  • OQR-2 TASS
Electronic warfare
& decoys
  • NOLQ-3 suite
  • Mk. 36 SRBOC Chaff and Decoy Launching System
  • AN/SLQ-25 torpedo decoys
Armament
Aircraft carried1 × SH-60J/K anti-submarine helicopter

Design


The hull design was completely renovated from first-generation destroyers. In addition to increasing the size in order to reduce the underwater radiation noise, both the superstructure and hull were inclined to reduce the radar cross-section. However, there is no angled tripod mainmast like the one of the American Arleigh Burke-class destroyer because of the heavy weather of the Sea of Japan in winter. The aft was designed like a "mini-Oranda-zaka" as with the Kongō class to avoid interference between helicopters and mooring devices.[2] Destroyers built under the First Defense Build-up Plan, including the former Murasame class, adopted a unique long forecastle style called "Oranda-zaka".

The engine arrangement is COGAG as same as Asagiri class, but a pair of engines were updated to Spey SM1C. The remaining one pair were replaced by LM2500, same as in the Kongō class.[2]


Construction and career


Inazuma was laid down on 8 May 1997 by Mitsubishi Heavy Industries at Nagasaki as part of the 1995 plan and launched on 9 September 1998. Commissioned on 15 March 2000, the destroyer was incorporated into the 4th Escort Corps and deployed to Kure.

From 26 August to 30 October 2018, Inazuma participated in the Indo-Pacific dispatch training with the escort vessels JS Kaga and JS Suzutsuki, and visited India, Indonesia, Singapore, Sri Lanka, Sri Lanka, and the Philippines. On 13 September, she joined the submarine JS Kuroshio in the South China Sea and conducted anti-submarine warfare training. On 26 September, a joint training between Japan and the United Kingdom was conducted with HMS Argyll heading for the South China Sea with Kaga in the sea and airspace west of Sumatra.[3]

On 21 May 2019, she departed for the "Reiwa first year pelagic practice voyage" with the training ship JS Kashima. The vessels visited 13 ports in 11 countries in 157 days with about 580 people, including about 190 people who completed the 69th General Executive Candidate Course (including 1 ensign of the Royal Thai Navy), in Yokosuka on 24 October.




Citations


  1. "DD-101 Murasame Class". globalsecurity.org. Retrieved 1 November 2020.
  2. Abe 2000, pp. 152–157.
  3. "日英共同訓練の実施について" (PDF) (Press release) (in Japanese). Japan Maritime Self-Defense Force. Retrieved 25 October 2022.

References






Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии